Soils

When is the best time to apply lime?

When it is required on the basis of a reputable, accurate soil test, and the application equipment will not rut or compact the field. It is true that maximum efficiency is attained by liming 3 to 4 months prior to the next crop and incorporating the material. However, the critical acidic conditions of many Mississippi soils mandates we should not delay application waiting for an "ideal" situation. The very fine particles in liming materials will begin neutralizing acidity soon after soil application.